|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/2/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0190
|
JOB ADDRESS: 7821 RIMROCK CIR FRISCO, TX |
DESC:
3049 AC, 3678 SF, SFR / 2 STORY |
|
OWNER:
PRD HOMES INC
4009 OLD DENTON RD #114-150 CARROLLTON TX 75007
|
CONTRACTOR:
PRD HOMES INC
4009 OLD DENTON RD #114-150 CARROLLTON TX 75007
|
ISSUED DATE: 2/9/2012
APPLIED DATE:2/1/2012
EXPIRED DATE:8/7/2012
SITE APN:C2061700
STATUS:COMPLETED
|
|
APPLICANT:
PRD HOMES INC
4009 OLD DENTON RD #114-150 CARROLLTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 227485.89
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 03/08/2012 CB | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
CREDIT CARD FEE | $1.80 |
INSULATION 04/24/2012 GLQ | $30.00 |
PLUMBING FINAL 07/03/2012 GU | $30.00 |
RESIDENTIAL ELECTRIC FEE | $110.34 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,633.75 |
FENCE FEE | $20.00 |
PLUMBING ROUGH-IN 02/27/2012 JTH | $30.00 |
PLUMBING ROUGH-IN 02/28/2012 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 04/10/2012 MC | $30.00 |
2NDS/FRAMING 04/12/2012 MC | $30.00 |
PLUMBING FINAL 07/06/2012 MC | $30.00 |
PLUMBING FINAL 07/09/2012 TRC | $30.00 |
Total Fees: | $2,799.89 |
|
|
| ______ METER PAYMENT |
______ SET 5/8 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|