|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/23/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0109
|
JOB ADDRESS: 12374 FLOWERING DR FRISCO, TX |
DESC:
2506 AC, 3346 SF, SFR / 2 STORY |
|
OWNER:
GEHAN HOMES LTD
14901 QUORUM DRIVE SUITE 300 DALLAS TX 75254
|
CONTRACTOR:
GEHAN HOMES LTD
14901 QUORUM DRIVE SUITE 300 DALLAS TX 75254
|
ISSUED DATE: 2/1/2012
APPLIED DATE:1/19/2012
EXPIRED DATE:7/30/2012
SITE APN:C2644661
STATUS:COMPLETED
|
|
APPLICANT:
GEHAN HOMES LTD
14901 QUORUM DRIVE SUITE 300 DALLAS TX 75254
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 186972.66
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $0.60 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $100.38 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,428.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
GAS RELEASE 04/02/2012 TRC | $30.00 |
Total Fees: | $2,344.23 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|