|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/16/2012
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B12-0076
|
JOB ADDRESS: 14928 FOXBRIAR FRISCO, TX 75035 |
DESC:
4007 AC, 4902 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
ISSUED DATE: 2/6/2012
APPLIED DATE:1/16/2012
EXPIRED DATE:8/4/2012
SITE APN:C2645376
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 298962.27
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
LANDSCAPE ESCROW FEE | $1,000.00 |
PLUMBTOPOUT/MECHRGH 04/09/2012 TRC | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,988.75 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
RESIDENTIAL ELECTRIC FEE | $147.06 |
Total Fees: | $11,456.31 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|