|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/21/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2854
|
JOB ADDRESS: 1345 TALLEY LN FRISCO, TX 75033 |
DESC:
4180 AC, 4937 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES
2404 TEXAS DRIVE #103 IRVING TX 75062
|
CONTRACTOR:
SUMEER HOMES
2404 TEXAS DRIVE #103 IRVING TX 75062
|
ISSUED DATE: 12/28/2011
APPLIED DATE:12/20/2011
EXPIRED DATE:6/25/2012
SITE APN:D620267
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
2404 TEXAS DRIVE #103 IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 311869.8
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 01/25/2012 CB | $30.00 |
CAMERA 03/27/2012 CB | $30.00 |
PLUMBTOPOUT/MECHRGH 04/04/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 04/10/2012 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 04/16/2012 JBS | $30.00 |
GAS RELEASE 06/12/2012 JBS | $30.00 |
GAS RELEASE 06/13/2012 JBS | $30.00 |
2NDS/FRAMING 04/18/2012 JDSM | $30.00 |
THOROUGHFARE IMPACT FEE | $1,952.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
MISCELLANEOUS ELECTRICAL FEES | $148.11 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $267.00 |
BUILDING PERMIT FEE | $2,053.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
Total Fees: | $6,157.86 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|