Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/28/2011 PERMIT SUB-TYPE: SNEW PERMIT NO: B11-2696
JOB ADDRESS:
6099 CHAMBERLYNE DR
FRISCO, TX 75034
DESC:   13615 AC, 16600 SF, SFR / 2 STORY
OWNER:
VCH HOLDINGS
SUITE 113
DALLAS TX 75252

CONTRACTOR:
VCH HOLDINGS
SUITE 113
DALLAS TX 75252
ISSUED DATE:
1/11/2012
APPLIED DATE:
11/23/2011
EXPIRED DATE:
4/1/2015
SITE APN:
C2068896
STATUS:
COMPLETED
APPLICANT:
VCH HOLDINGS
SUITE 113
DALLAS TX 75252
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
1015815.15
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 04/04/2013 CW$30.00
DRY WALL 05/28/2013 CW$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
CREDIT CARD FEE$1.60
CREDIT CARD FEE$0.60
RESIDENTIAL ELECTRIC FEE$498.00
MISCELLANOUS MECHANICAL FEES$268.00
MISCELLANEOUS PLUMBING FEES$387.00
BUILDING PERMIT FEE$5,659.15
FENCE FEE$20.00
CO/BUILDING FINAL 10/01/2014 JCF$0.00
GAS RELEASE 07/31/2014 JTH$30.00
PLUMBING TOP OUT 03/12/2013 JWI$30.00
UTILITY / ROW 09/25/2014 KB$80.00
UTILITY / ROW 09/29/2014 KB$30.00
FIRE DEPT INSPECTION FEES$498.00
ELECTRICAL ROUGH IN 03/12/2013 REED$30.00
SLAB 10/18/2012 WKT$30.00
Total Fees:$8,052.35
______  T-POLE
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  PIER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  SLAB
______  CAMERA
______  PIER
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  SHEATHING
______  AUTOFIRE SPRK HYDRO
______  LATH
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  DRY WALL
______  LATH
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  ELECTRICAL FINAL
______  PLUMBMECHFINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)