|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/26/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2496
|
JOB ADDRESS: 13975 VERANDA FRISCO, TX 75035 |
DESC:
3093 AC, 3507 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15950 N DALLAS PKY #6001544 ST ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
15950 N DALLAS PKY #6001544 ST ADDISON TX 75001
|
ISSUED DATE: 10/28/2011
APPLIED DATE:10/24/2011
EXPIRED DATE:4/25/2012
SITE APN:C2637842
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15950 N DALLAS PKY #6001544 ST ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 230768.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 11/16/2011 CB | $30.00 |
CAMERA 01/05/2012 CB | $30.00 |
MISCELLANEOUS BUILDING PERMIT FEES | $10.00 |
CREDIT CARD FEE | $0.20 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
REPLACE READABLE REGISTER | $190.00 |
GAS RELEASE 02/27/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $105.21 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,648.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 02/28/2012 KB | $30.00 |
THOROUGHFARE IMPACT FEE | $1,683.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $28.00 |
RESIDENTIAL ELECTRIC FEE | $2.81 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $5,044.47 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ T-POLE |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ WATER REGISTER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|