|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/21/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2474
|
JOB ADDRESS: 13611 LYNDHURST DR FRISCO, TX |
DESC:
4004 AC, 4855 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
ISSUED DATE: 10/25/2011
APPLIED DATE:10/20/2011
EXPIRED DATE:4/22/2012
SITE APN:C2649992
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 279339.84
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PIER 10/28/2011 CW | $30.00 |
FLATWORK 11/08/2011 CW | $30.00 |
2NDS/FRAMING 12/02/2011 CW | $30.00 |
2NDS/FRAMING 12/06/2011 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBTOPOUT/MECHRGH 11/30/2011 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $145.65 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,893.75 |
FENCE FEE | $20.00 |
GAS RELEASE 01/17/2012 JTH | $30.00 |
PLUMBING FINAL 02/29/2012 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $1,967.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
Total Fees: | $8,505.90 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PIER |
______ PIER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|