|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/3/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2301
|
JOB ADDRESS: 11631 FRAGRANT DR FRISCO, TX 75035 |
DESC:
2231 AC, 2935 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
4306 MILLER RD STE A ROWLETT TX 75088
|
CONTRACTOR:
DR HORTON
4306 MILLER RD STE A ROWLETT TX 75088
|
ISSUED DATE: 10/12/2011
APPLIED DATE:9/29/2011
EXPIRED DATE:4/9/2012
SITE APN:C2613662
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
4306 MILLER RD STE A ROWLETT TX 75088
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 166454.91
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 10/18/2011 BS | $50.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
ELECTRICAL ROUGH IN 11/17/2011 CW | $30.00 |
2NDS/FRAMING 11/22/2011 CW | $30.00 |
INSULATION 12/01/2011 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
CREDIT CARD FEE | $3.60 |
RESIDENTIAL ELECTRIC FEE | $88.05 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,328.75 |
FENCE FEE | $20.00 |
PLUMBTOPOUT/MECHRGH 11/17/2011 JTH | $30.00 |
Total Fees: | $3,278.40 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ SET 1 PD METER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|