Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/26/2011 PERMIT SUB-TYPE: SNEW PERMIT NO: B11-2256
JOB ADDRESS:
8866 MARKHAM DR
FRISCO, TX
DESC:   4644 AC, 5514 SF, SFR / 2 STORY
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300
PLANO TX 75024

CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300
PLANO TX 75024
ISSUED DATE:
9/28/2011
APPLIED DATE:
9/23/2011
EXPIRED DATE:
3/26/2012
SITE APN:
C2649965
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300
PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
346488.84
FEE SUMMARY
INSPECTION SUMMARY
DRY WALL 11/07/2011 CW$30.00
ELECTRICAL FINAL 11/29/2011 CW$30.00
GAS RELEASE 11/30/2011 JBS$30.00
RESIDENTIAL ELECTRIC FEE$165.42
MISCELLANOUS MECHANICAL FEES$142.50
MISCELLANEOUS PLUMBING FEES$281.00
BUILDING PERMIT FEE$2,228.75
FENCE FEE$20.00
PLUMBTOPOUT/MECHRGH 10/27/2011 JTH$30.00
THOROUGHFARE IMPACT FEE$1,967.00
WATER IMPACT FEE$1,911.00
SEWER IMPACT FEE$1,553.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
Total Fees:$8,818.67
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  FLATWORK
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  DRY WALL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITY / ROW
______  UTILITY / ROW
______  PLUMBING FINAL
______  PLUMBING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)