|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/16/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2199
|
JOB ADDRESS: 4188 FOREST PARK LN FRISCO, TX 75033 |
DESC:
4929 AC, 5999 SF, SFR / 2 STORY |
|
OWNER:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
CONTRACTOR:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
ISSUED DATE: 9/27/2011
APPLIED DATE:9/15/2011
EXPIRED DATE:3/25/2012
SITE APN:D296494
STATUS:COMPLETED
|
|
APPLICANT:
JPA DEVELOPMENT CORPORATION
5729 LEBANON DR #144-201 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 367752.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 10/11/2011 CB | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
REPLACE READABLE REGISTER | $190.00 |
CREDIT CARD FEE | $3.60 |
CREDIT CARD FEE | $3.80 |
ELECTRICAL ROUGH IN 11/21/2011 GDS | $30.00 |
2NDS/FRAMING 12/02/2011 GDS | $30.00 |
PLUMBING FINAL 04/06/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $179.97 |
MISCELLANOUS MECHANICAL FEES | $169.00 |
MISCELLANEOUS PLUMBING FEES | $298.00 |
BUILDING PERMIT FEE | $2,333.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 04/06/2012 KB | $30.00 |
ELECTRICAL FINAL 02/24/2012 REED | $30.00 |
Total Fees: | $3,808.12 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|