|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/16/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2198
|
JOB ADDRESS: 2235 DAMPTON DR FRISCO, TX 75033 |
DESC:
4069 AC, 4987 SF, SFR / 2 STORY |
|
OWNER:
JPAS DEVELOPMENT CORPPRATION
2064 TALBOT DR FRISCO TX 75033
|
CONTRACTOR:
JPAS DEVELOPMENT CORPPRATION
2064 TALBOT DR FRISCO TX 75033
|
ISSUED DATE: 9/19/2011
APPLIED DATE:9/15/2011
EXPIRED DATE:3/17/2012
SITE APN:D524344
STATUS:COMPLETED
|
|
APPLICANT:
JPAS DEVELOPMENT CORPPRATION
2064 TALBOT DR FRISCO TX 75033
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 303588.09
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $149.61 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,013.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $0.60 |
2NDS/FRAMING 11/22/2011 GDS | $30.00 |
2NDS/FRAMING 11/29/2011 JKT | $30.00 |
THOROUGHFARE IMPACT FEE | $1,952.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
SLAB 10/03/2011 REED | $30.00 |
GAS RELEASE 02/01/2012 TRC | $30.00 |
GAS RELEASE 02/06/2012 TRC | $30.00 |
Total Fees: | $6,018.36 |
|
|
| ______ METER PAYMENT |
______ SET 5/8 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|