|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/15/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-2183
|
JOB ADDRESS: 13514 THORNTON DR FRISCO, TX |
DESC:
4610 AC, 5618 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
CONTRACTOR:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
ISSUED DATE: 9/16/2011
APPLIED DATE:9/13/2011
EXPIRED DATE:3/14/2012
SITE APN:C2649918
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
5601 DEMOCRACY DRIVE STE 300 PLANO TX 75024
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 343952.1
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 09/22/2011 MXH | $50.00 |
CAMERA 09/30/2011 CB | $30.00 |
RESIDENTIAL ELECTRIC FEE | $168.54 |
MISCELLANOUS MECHANICAL FEES | $149.00 |
MISCELLANEOUS PLUMBING FEES | $316.00 |
BUILDING PERMIT FEE | $2,213.75 |
FENCE FEE | $20.00 |
ELECTRICAL ROUGH IN 10/19/2011 CW | $30.00 |
2NDS/FRAMING 10/26/2011 CW | $30.00 |
PLUMBING FINAL 12/19/2011 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 10/20/2011 JBS | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $1,967.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBING ROUGH-IN 09/22/2011 TRC | $30.00 |
Total Fees: | $8,958.29 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ LATH |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|