|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/15/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1702
|
JOB ADDRESS: 2877 AERIAL DR FRISCO, TX 75034 |
DESC:
4056 AC, 4732 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15950 N DALLAS PKY #6001544 DA ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
15950 N DALLAS PKY #6001544 DA ADDISON TX 75001
|
ISSUED DATE: 8/2/2011
APPLIED DATE:7/15/2011
EXPIRED DATE:1/29/2012
SITE APN:D619449
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15950 N DALLAS PKY #6001544 DA ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 302618.16
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 08/05/2011 MXH | $50.00 |
PLUMBTOPOUT/MECHRGH 10/04/2011 CK | $30.00 |
GAS RELEASE 12/20/2011 CK | $30.00 |
INSULATION 11/04/2011 CW | $30.00 |
ELECTRICAL ROUGH IN 10/04/2011 GDS | $30.00 |
ELECTRICAL ROUGH IN 10/20/2011 GDS | $30.00 |
2NDS/FRAMING 11/01/2011 GDS | $30.00 |
INSULATION 11/07/2011 GDS | $30.00 |
INSULATION 11/08/2011 GDS | $30.00 |
SLAB 08/18/2011 GLQ | $30.00 |
SHEATHING 09/20/2011 GLQ | $30.00 |
PLUMBING FINAL 12/27/2011 JBS | $30.00 |
PLUMBTOPOUT/MECHRGH 09/21/2011 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 09/22/2011 JTH | $30.00 |
PLUMBTOPOUT/MECHRGH 10/03/2011 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
THOROUGHFARE IMPACT FEE | $858.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
RESIDENTIAL ELECTRIC FEE | $141.96 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $2,008.75 |
FENCE FEE | $20.00 |
Total Fees: | $7,788.71 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ FLATWORK |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|