|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/14/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1687
|
JOB ADDRESS: 10459 SHIRE VIEW FRISCO, TX 75035 |
DESC:
3213 AC, 3883 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15950 N DALLAS PKY #6001544 DA ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
15950 N DALLAS PKY #6001544 DA ADDISON TX 75001
|
ISSUED DATE: 7/25/2011
APPLIED DATE:7/14/2011
EXPIRED DATE:1/21/2012
SITE APN:C2635767
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15950 N DALLAS PKY #6001544 DA ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 239721.93
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 08/08/2011 ARG | $50.00 |
RESIDENTIAL ELECTRIC FEE | $116.49 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,693.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 10/03/2011 CW | $30.00 |
DRY WALL 10/17/2011 GLQ | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
DRY WALL 10/17/2011 GLQ | $10.00 |
PLUMBING ROUGH-IN 08/12/2011 | $30.00 |
PLUMBING ROUGH-IN 08/15/2011 | $30.00 |
PLUMBTOPOUT/MECHRGH 09/23/2011 JBS | $30.00 |
GAS RELEASE 11/14/2011 JTH | $30.00 |
PLUMBING FINAL 11/17/2011 JTH | $30.00 |
Total Fees: | $2,881.74 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|