|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/20/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1499
|
JOB ADDRESS: 3945 CATHEDRAL LAKE DR FRISCO, TX |
DESC:
5020 AC, 5962 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
ISSUED DATE: 7/5/2011
APPLIED DATE:6/20/2011
EXPIRED DATE:1/1/2012
SITE APN:D622268
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 374542.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 09/29/2011 CK | $30.00 |
RESIDENTIAL ELECTRIC FEE | $178.86 |
MISCELLANOUS MECHANICAL FEES | $149.00 |
MISCELLANEOUS PLUMBING FEES | $302.00 |
BUILDING PERMIT FEE | $2,368.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $2.70 |
CREDIT CARD FEE | $0.90 |
GAS RELEASE 11/14/2011 JBS | $30.00 |
THOROUGHFARE IMPACT FEE | $2,469.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
ELECTRICAL ROUGH IN 09/01/2011 | $30.00 |
BRICK/WALL TIES 09/13/2011 RE | $30.00 |
Total Fees: | $9,505.21 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ FLATWORK |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|