|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/31/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1288
|
JOB ADDRESS: 13244 TABER TRL FRISCO, TX |
DESC:
2859 AC, 3606 SF, SFR / 1 STORY |
|
OWNER:
GEHAN HOMES LTD
14901 QUORUM DRIVE SUITE 300 DALLAS TX 75254
|
CONTRACTOR:
GEHAN HOMES LTD
14901 QUORUM DRIVE SUITE 300 DALLAS TX 75254
|
ISSUED DATE: 6/13/2011
APPLIED DATE:5/26/2011
EXPIRED DATE:12/10/2011
SITE APN:C2631837
STATUS:COMPLETED
|
|
APPLICANT:
GEHAN HOMES LTD
14901 QUORUM DRIVE SUITE 300 DALLAS TX 75254
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 213309.99
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $0.90 |
PLUMBTOPOUT/MECHRGH 07/19/2011 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $111.42 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,563.75 |
FENCE FEE | $20.00 |
SLAB 06/28/2011 JDSM | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
Total Fees: | $2,464.97 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|