|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/31/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1285
|
JOB ADDRESS: 7158 GREYSTONE LN FRISCO, TX |
DESC:
4245 AC, 5147 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
ISSUED DATE: 6/2/2011
APPLIED DATE:5/26/2011
EXPIRED DATE:11/29/2011
SITE APN:D622199
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 316719.45
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE READABLE REGISTER | $190.00 |
CREDIT CARD FEE | $6.60 |
CREDIT CARD FEE | $0.60 |
SLAB 06/13/2011 GDS | $30.00 |
PLUMBING FINAL 03/12/2012 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $154.41 |
MISCELLANOUS MECHANICAL FEES | $169.00 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $2,078.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 10/11/2011 KB | $30.00 |
THOROUGHFARE IMPACT FEE | $2,469.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
SHEATHING 07/19/2011 REED | $30.00 |
2NDS/FRAMING 07/29/2011 REED | $30.00 |
2NDS/FRAMING 08/03/2011 REED | $30.00 |
Total Fees: | $9,446.36 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|