|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/20/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1208
|
JOB ADDRESS: 12755 RIDGE SPRING FRISCO, TX 75035 |
DESC:
3350 AC, 4120 SF, SFR / 2 STORY |
|
OWNER:
MHI - COVENTRY, PLANTATION PIO
1501 LBJ FRWY STE 100 DALLAS TX 75234
|
CONTRACTOR:
MHI - COVENTRY, PLANTATION PIO
1501 LBJ FRWY STE 100 DALLAS TX 75234
|
ISSUED DATE: 6/1/2011
APPLIED DATE:5/18/2011
EXPIRED DATE:11/28/2011
SITE APN:C2647657
STATUS:COMPLETED
|
|
APPLICANT:
MHI - COVENTRY, PLANTATION PIO
1501 LBJ FRWY STE 100 DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 249943.5
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 06/28/2011 ARG | $50.00 |
SLAB 07/11/2011 CW | $30.00 |
SLAB 07/12/2011 CW | $30.00 |
ELECTRICAL ROUGH IN 08/11/2011 | $30.00 |
2NDS/FRAMING 08/17/2011 CW | $30.00 |
PLUMBING ROUGH-IN 07/05/2011 | $30.00 |
PLUMBTOPOUT/MECHRGH 08/10/2011 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $140.79 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,743.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 10/06/2011 KB | $30.00 |
THOROUGHFARE IMPACT FEE | $4,000.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
Total Fees: | $10,427.04 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|