|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/3/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-1037
|
JOB ADDRESS: 4085 FOREST PARK LN FRISCO, TX 75034 |
DESC:
4975 AC, 6149 SF, SFR / 2 STORY |
|
OWNER:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
CONTRACTOR:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
ISSUED DATE: 5/10/2011
APPLIED DATE:5/3/2011
EXPIRED DATE:11/6/2011
SITE APN:D296536
STATUS:COMPLETED
|
|
APPLICANT:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 371184.75
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
CREDIT CARD FEE | $4.50 |
2NDS/FRAMING 07/18/2011 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 07/06/2011 | $30.00 |
PLUMBTOPOUT/MECHRGH 07/08/2011 | $30.00 |
GAS RELEASE 09/12/2011 JTH | $30.00 |
GAS RELEASE 09/15/2011 JTH | $30.00 |
FIRE DEPT INSPECTION FEES | $184.47 |
RESIDENTIAL ELECTRIC FEE | $184.47 |
MISCELLANOUS MECHANICAL FEES | $155.50 |
MISCELLANEOUS PLUMBING FEES | $302.00 |
BUILDING PERMIT FEE | $2,353.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,784.69 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ AUTOFIRE SPRK HYDRO |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|