|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/7/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-0771
|
JOB ADDRESS: 11553 PENICK WAY FRISCO, TX 75034-1797 |
DESC:
3094 SF, 3918 SF, SFR / 2 STORY |
|
OWNER:
BLOOMFIELD HOMES
1050 E HWY 114 SUITE 210 SOUTHLAKE TX 76092
|
CONTRACTOR:
BLOOMFIELD HOMES
1050 E HWY 114 SUITE 210 SOUTHLAKE TX 76092
|
ISSUED DATE: 4/15/2011
APPLIED DATE:4/6/2011
EXPIRED DATE:10/12/2011
SITE APN:D278047
STATUS:COMPLETED
|
|
APPLICANT:
BLOOMFIELD HOMES
1050 E HWY 114 SUITE 210 SOUTHLAKE TX 76092
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 230843.34
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
MISC SLAB 05/10/2011 CW | $30.00 |
2NDS/FRAMING 06/17/2011 CW | $30.00 |
INSULATION 06/23/2011 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
ELECTRICAL FINAL 08/03/2011 G | $30.00 |
PLUMBTOPOUT/MECHRGH 06/14/2011 | $30.00 |
BRICK/WALL TIES 07/06/2011 JK | $30.00 |
UTILITY / ROW 10/06/2011 KB | $30.00 |
CREDIT CARD FEE | $1.80 |
RESIDENTIAL ELECTRIC FEE | $117.54 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $1,648.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,817.09 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ MISC SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|