|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/3/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-0433
|
JOB ADDRESS: 4965 KESSLER DR FRISCO, TX |
DESC:
2354 AC, 3068 SF, SFR / 1 STORY |
|
OWNER:
BEAZER HOMES
501 W. George Bush Hwy, #100 Richardson TX 75080
|
CONTRACTOR:
BEAZER HOMES
501 W. George Bush Hwy, #100 Richardson TX 75080
|
ISSUED DATE: 3/10/2011
APPLIED DATE:3/2/2011
EXPIRED DATE:9/6/2011
SITE APN:D468613
STATUS:COMPLETED
|
|
APPLICANT:
BEAZER HOMES
501 W. George Bush Hwy, #100 Richardson TX 75080
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 175631.94
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $92.04 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $209.00 |
BUILDING PERMIT FEE | $1,373.75 |
FENCE FEE | $20.00 |
ELECTRICAL ROUGH IN 05/16/2011 | $30.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
Total Fees: | $5,715.29 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|