|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/2/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-0416
|
JOB ADDRESS: 3544 GREENBRIER DR FRISCO, TX 75034 |
DESC:
4220 AC, 5455 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES
2500 LEGACY STE # 100 FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES
2500 LEGACY STE # 100 FRISCO TX 75034
|
ISSUED DATE: 3/18/2011
APPLIED DATE:2/28/2011
EXPIRED DATE:9/14/2011
SITE APN:D613128
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES
2500 LEGACY STE # 100 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 314854.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $163.65 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $2,068.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 05/16/2011 CW | $30.00 |
ELECTRICAL FINAL 07/08/2011 G | $30.00 |
PLUMBING ROUGH-IN 04/06/2011 | $30.00 |
PLUMBTOPOUT/MECHRGH 05/10/2011 | $30.00 |
GAS RELEASE 07/11/2011 JTH | $30.00 |
PLUMBING FINAL 08/02/2011 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $3,602.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
Total Fees: | $10,324.40 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|