Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/17/2011 PERMIT SUB-TYPE: SNEW PERMIT NO: B11-0306
JOB ADDRESS:
10876 OLD SAYBROOK LN
FRISCO, TX 75034
DESC:   5215 AC, 6044 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES
2404 TEXAS DRIVE #103
IRVING TX 75062

CONTRACTOR:
SUMEER HOMES
2404 TEXAS DRIVE #103
IRVING TX 75062
ISSUED DATE:
2/25/2011
APPLIED DATE:
2/16/2011
EXPIRED DATE:
8/24/2011
SITE APN:
D296450
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES
2404 TEXAS DRIVE #103
IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
389091.15
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 04/18/2011 CW$30.00
2NDS/FRAMING 04/19/2011 CW$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
1 INCH CURBSTOP REPAIR / REPLA$18.71
PLUMBING FINAL 04/24/2012 JBS$30.00
RESIDENTIAL ELECTRIC FEE$181.32
MISCELLANOUS MECHANICAL FEES$169.00
MISCELLANEOUS PLUMBING FEES$305.00
BUILDING PERMIT FEE$2,443.75
FENCE FEE$20.00
GAS RELEASE 09/08/2011 JTH$30.00
Total Fees:$3,687.78
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  ELECTRICAL FINAL
______  FLATWORK
______  GAS RELEASE
______  GAS RELEASE
______  UTILITY / ROW
______  PLUMBING FINAL
______  PLUMBING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)