|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/31/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-0136
|
JOB ADDRESS: 3743 VANDERBILT LN FRISCO, TX 75034 |
DESC:
4042 AC, 4905 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15950 N DALLAS PKY #600 DALLAS TX 75248
|
CONTRACTOR:
GRAND HOMES
15950 N DALLAS PKY #600 DALLAS TX 75248
|
ISSUED DATE: 2/8/2011
APPLIED DATE:1/24/2011
EXPIRED DATE:8/7/2011
SITE APN:D611709
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15950 N DALLAS PKY #600 DALLAS TX 75248
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 315824.13
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 02/10/2011 CXC | $50.00 |
RESIDENTIAL ELECTRIC FEE | $142.17 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $2,073.75 |
FENCE FEE | $20.00 |
CREDIT CARD FEE | $0.90 |
CO 07/21/2011 GDS | $30.00 |
FLATWORK 06/17/2011 REED | $30.00 |
INSULATION 06/01/2011 JKT | $30.00 |
CREDIT CARD FEE | $3.60 |
PLUMBING FINAL 07/14/2011 MC | $30.00 |
1 INCH PD METER | $355.00 |
WATER METER DEPOSIT | $75.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER IMPACT FEE | $1,911.00 |
THOROUGHFARE IMPACT FEE | $2,469.00 |
PLUMBTOPOUT/MECHRGH 05/13/2011 | $30.00 |
PLUMBTOPOUT/MECHRGH 05/13/2011 | $30.00 |
PLUMBTOPOUT/MECHRGH 05/13/2011 | $30.00 |
PLAN REVIEW FEE | $50.00 |
INSULATION 05/26/2011 GLQ | $30.00 |
SLAB 04/11/2011 GLQ | $30.00 |
Total Fees: | $9,355.42 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ APPROACH |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO |
______ CO |
______ CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|