|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/24/2011
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B11-0134
|
JOB ADDRESS: 12070 BROWNWOOD DR FRISCO, TX 75070 |
DESC:
2930 AC, 3374 SF, SFR / 2 STORY |
|
OWNER:
MERITAGE HOMES
909 HIDDEN RIDGE #400 IRVING TX 75038
|
CONTRACTOR:
MERITAGE HOMES
909 HIDDEN RIDGE #400 IRVING TX 75038
|
ISSUED DATE: 2/10/2011
APPLIED DATE:1/21/2011
EXPIRED DATE:8/9/2011
SITE APN:C2520157
STATUS:COMPLETED
|
|
APPLICANT:
MERITAGE HOMES
909 HIDDEN RIDGE #400 IRVING TX 75038
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 218607.3
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $2.70 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
RESIDENTIAL ELECTRIC FEE | $101.22 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,588.75 |
FENCE FEE | $20.00 |
BRICK/WALL TIES 04/11/2011 JD | $30.00 |
BRICK/WALL TIES 04/14/2011 JD | $30.00 |
2NDS/FRAMING 04/04/2011 JKT | $30.00 |
ELECTRICAL FINAL 05/12/2011 J | $30.00 |
CREDIT CARD FEE | $0.90 |
GAS RELEASE 05/20/2011 TRC | $30.00 |
PLUMBING FINAL 05/26/2011 TRC | $30.00 |
PLUMBING FINAL 05/27/2011 TRC | $30.00 |
2NDS/FRAMING 03/31/2011 WKT | $30.00 |
Total Fees: | $2,752.07 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ BRICK/WALL TIES |
______ INSULATION |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|