BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/14/2011
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B11-0079
|
JOB ADDRESS: 5680 FRISCO SQUARE BLVD FRISCO, TX |
DESC:
101850 SQ FT, CNEW / FOREST PARK MEDICAL OFFICE AND RETAIL |
|
OWNER:
BHFS I LLC
15601 DALLAS PKWY STE 600 ADDISON TX 75001-6026
|
CONTRACTOR:
BALFOUR BEATTY CONSTRUCTION
3100 MCKINNEY ST, 7TH FLOOR MCKINNEY TX 75070
|
ISSUED DATE: 3/14/2011
APPLIED DATE:1/14/2011
EXPIRED DATE:9/10/2011
SITE APN:C2656471
STATUS:COMPLETED
|
|
APPLICANT:
BALFOUR BEATTY CONSTRUCTION
3100 MCKINNEY ST, 7TH FLOOR MCKINNEY TX 75070
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 8250000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
3 INCH COMP METER | $2,175.00 |
WATER METER DEPOSIT | $75.00 |
3 INCH COMP METER | $2,175.00 |
WATER METER DEPOSIT | $75.00 |
2 INCH PD METER | $635.00 |
CREDIT CARD FEE | $1.05 |
CREDIT CARD FEE | $1.40 |
MISCELLANEOUS ELECTRICAL FEES | $4,844.00 |
MISCELLANOUS MECHANICAL FEES | $3,055.55 |
MISCELLANEOUS PLUMBING FEES | $250.00 |
FIRE DEPT INSPECTION FEES | $100.00 |
FIRE DEPT INSPECTION FEES | $400.00 |
FIRE DEPT INSPECTION FEES | $100.00 |
FIRE DEPT INSPECTION FEES | $150.00 |
COMM PLUMB TOP OUT 03/06/2012 TRC | $35.00 |
PLUMBING FINAL 05/17/2012 TRC | $35.00 |
CREDIT CARD FEE | $2.00 |
COMMERCIAL BUILDING PERMIT FEE | $17,069.64 |
CMUWALL 10/19/2011 WKT | $35.00 |
Total Fees: | $31,288.64 |
|
|
| ______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ PIER |
______ FOOTINGS |
______ ELECTRICAL ROUGH IN |
______ FOOTINGS |
______ UNDERGROUND ELEC |
______ UNDRGR FIRE MAIN HYD |
______ UNDRGR FIRE MAIN VIS |
______ FOOTINGS |
______ UNDRGR FIRE MAIN HYD |
______ UNDRGR FIRE MAIN VIS |
______ FOOTINGS |
______ FOOTINGS |
______ UNDRGR FIRE MAIN HYD |
______ UNDRGR FIRE MAIN VIS |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ COMM SLAB |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ COMM SLAB |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ SEWER |
______ MISC SLAB |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ COMM SLAB |
______ FOOTINGS |
______ METER PAYMENT |
______ METER PAYMENT |
______ 3 PD METER |
______ 3 PD METER |
______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FOOTINGS |
______ FOOTINGS |
______ FOOTINGS |
______ UNDRGR FIRE MAIN FLU |
______ MISC SLAB |
______ UNDRGR FIRE MAIN FLU |
______ SET 2 PD METER |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ CMUWALL |
______ COMM SLAB |
______ CMUWALL |
______ CMUWALL |
______ COMM SLAB |
______ CMUWALL |
______ CMUWALL |
______ CMUWALL |
______ CMUWALL |
______ CMUWALL |
______ CMUWALL |
______ SHEATHING |
______ CMUWALL |
______ COMM FRAME |
______ SHEATHING |
______ CMUWALL |
______ SHEATHING |
______ BRICK/WALL TIES |
______ CMUWALL |
______ SHEATHING |
______ BRICK/WALL TIES |
______ BRICK |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ COMM SLAB |
______ COMM SLAB |
______ MECHANICAL ROUGH |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL ROUGH IN |
______ MISCFRAME |
______ COMM PLUMB TOP OUT |
______ COMMDRYWALL |
______ MECHANICAL ROUGH |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL ROUGH IN |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL ROUGH IN |
______ INSULATION |
______ ELECTRICAL RELEASE |
______ MECHANICAL ROUGH |
______ INSULATION |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL RELEASE |
______ ELECTRICAL RELEASE |
______ FOOTINGS |
______ INSULATION |
______ ELECTRICAL ROUGH IN |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ INSULATION |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ INSULATION |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ INSULATION |
______ CEILING |
______ PLUMBING FINAL |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ CEILING |
______ AUTOFIRE SPRK HYDRO |
______ AUTOFIRE SPRK VISUAL |
______ INSULATION |
______ AUTOFIRE SPRK HYDRO |
______ INSULATION |
______ FIRE FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ FIRE FINAL |
______ COMM CO |
______ FIRE FINAL |
______ FIRE FINAL |
______ 3 PD METER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|