Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/12/2011 PERMIT SUB-TYPE: SNEW PERMIT NO: B10-2750
JOB ADDRESS:
4052 CASTLE BANK LN
FRISCO, TX 75034
DESC:   5422 AC, 6574 SF, SFR / 2 STORY
OWNER:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500
DALLAS TX 75225

CONTRACTOR:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500
DALLAS TX 75225
ISSUED DATE:
2/9/2011
APPLIED DATE:
12/28/2010
EXPIRED DATE:
8/8/2011
SITE APN:
D296562
STATUS:
COMPLETED
APPLICANT:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500
DALLAS TX 75225
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
404535.42
FEE SUMMARY
INSPECTION SUMMARY
ELECTRICAL ROUGH IN 04/04/2011$30.00
CREDIT CARD FEE$2.70
FENCE FEE$20.00
BUILDING PERMIT FEE$2,518.75
RESIDENTIAL ELECTRIC FEE$197.22
2NDS/FRAMING 04/14/2011 MC$30.00
CREDIT CARD FEE$3.60
REPLACEMENT CARD FEE$10.00
1 INCH PD METER$355.00
WATER METER DEPOSIT$75.00
PLUMBTOPOUT/MECHRGH 04/11/2011$30.00
PLUMBTOPOUT/MECHRGH 04/11/2011$30.00
PLUMBTOPOUT/MECHRGH 04/04/2011$30.00
FIRE DEPT INSPECTION FEES$162.66
PLAN REVIEW FEE$50.00
MISCELLANEOUS PLUMBING FEES$319.00
MISCELLANOUS MECHANICAL FEES$175.50
Total Fees:$4,039.43
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  CAMERA
______  SHEATHING
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  UTILITY / ROW
______  PLUMBING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)