|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/28/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-2722
|
JOB ADDRESS: 2829 MCGREGOR DR FRISCO, TX 75034 |
DESC:
3199 AC, 3866 SF, SFR / 1 STORY |
|
OWNER:
MERCEDES HOMES
11494 LUNA RD #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA RD #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 1/20/2011
APPLIED DATE:12/20/2010
EXPIRED DATE:7/19/2011
SITE APN:D619429
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA RD #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 238677.39
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $0.90 |
PLUMBTOPOUT/MECHRGH 03/24/2011 | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,688.75 |
MISCELLANEOUS PLUMBING FEES | $223.00 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
RESIDENTIAL ELECTRIC FEE | $115.98 |
1 INCH PD METER | $355.00 |
WATER METER DEPOSIT | $75.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER IMPACT FEE | $1,911.00 |
THOROUGHFARE IMPACT FEE | $858.00 |
Total Fees: | $6,927.13 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|