|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/4/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-2395
|
JOB ADDRESS: 11505 GERANIUM FRISCO, TX 75035 |
DESC:
3773 AC, 4479 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 11/16/2010
APPLIED DATE:11/2/2010
EXPIRED DATE:5/15/2011
SITE APN:C2613680
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 281503.53
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-POLE 11/17/2010 CW | $30.00 |
PLUMBTOPOUT/MECHRGH 12/21/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 12/28/2010 | $30.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
RESIDENTIAL ELECTRIC FEE | $134.37 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,903.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,871.12 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|