Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/3/2010 PERMIT SUB-TYPE: SNEW PERMIT NO: B10-2350
JOB ADDRESS:
9615 LANCE
FRISCO, TX 75035
DESC:   3020 AC, 3762 SF, SFR / 2 STORY
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006

CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006
ISSUED DATE:
11/8/2010
APPLIED DATE:
10/26/2010
EXPIRED DATE:
5/7/2011
SITE APN:
C2637833
STATUS:
COMPLETED
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100
ARLINGTON TX 76006
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
225322.2
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING FINAL 02/18/2011 GU$30.00
PLUMBTOPOUT/MECHRGH 12/20/2010$30.00
PLAN REVIEW FEE$50.00
RESIDENTIAL ELECTRIC FEE$112.86
MISCELLANOUS MECHANICAL FEES$123.00
MISCELLANEOUS PLUMBING FEES$211.00
RESIDENTIAL RED TAG FEE$30.00
FENCE FEE$20.00
2NDS/FRAMING 12/27/2010 JKT$30.00
PLUMBTOPOUT/MECHRGH 12/16/2010$30.00
PLUMBTOPOUT/MECHRGH 12/21/2010$30.00
THOROUGHFARE IMPACT FEE$1,683.00
WATER IMPACT FEE$388.00
SEWER IMPACT FEE$28.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
DRY WALL 01/06/2011 REED$30.00
DRY WALL 01/07/2011 REED$30.00
BRICK/WALL TIES 01/07/2011 RE$30.00
Total Fees:$3,315.86
______  T-POLE
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  FLATWORK
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)