Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 10/26/2010 PERMIT SUB-TYPE: SNEW PERMIT NO: B10-2314
JOB ADDRESS:
12970 AMBROSE DR
FRISCO, TX 75035
DESC:   2651 AC, 3055 SF, SFR / 2 STORY
OWNER:
CENTEX HOMES
1603 LBJ Freeway Suite 700
DALLAS TX 75234

CONTRACTOR:
CENTEX HOMES
1603 LBJ Freeway Suite 700
DALLAS TX 75234
ISSUED DATE:
10/29/2010
APPLIED DATE:
10/21/2010
EXPIRED DATE:
4/27/2011
SITE APN:
C2587428
STATUS:
COMPLETED
APPLICANT:
CENTEX HOMES
1603 LBJ Freeway Suite 700
DALLAS TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
197791.11
FEE SUMMARY
INSPECTION SUMMARY
FENCE FEE$20.00
BUILDING PERMIT FEE$1,483.75
MISCELLANEOUS PLUMBING FEES$211.00
MISCELLANOUS MECHANICAL FEES$123.00
RESIDENTIAL ELECTRIC FEE$91.65
INSULATION 01/10/2011 REED$30.00
CREDIT CARD FEE$0.90
1 INCH PD METER$355.00
WATER METER DEPOSIT$75.00
T-POLE 11/18/2010 CSW$30.00
Total Fees:$2,420.30
______  METER PAYMENT
______  T-POLE
______  T-POLE
______  PLUMBING ROUGH-IN
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION
______  INSULATION
______  INSULATION
______  DRY WALL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  SET 1 PD METER
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)