|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/1/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-2147
|
JOB ADDRESS: 3855 CATHEDRAL LAKE DR FRISCO, TX |
DESC:
4921 AC, 5777 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
ISSUED DATE: 10/11/2010
APPLIED DATE:9/29/2010
EXPIRED DATE:4/9/2011
SITE APN:D622271
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 367155.81
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 10/13/2010 CXC | $50.00 |
SLAB 11/19/2010 CW | $30.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.70 |
CREDIT CARD FEE | $1.80 |
GAS RELEASE 03/07/2011 JBS | $30.00 |
THOROUGHFARE IMPACT FEE | $2,469.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBING ROUGH-IN 11/16/2010 | $30.00 |
PLUMBING ROUGH-IN 11/15/2010 | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,333.75 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
RESIDENTIAL ELECTRIC FEE | $173.31 |
INSULATION 01/20/2011 GLQ | $30.00 |
ELECTRICAL ROUGH IN 01/04/2011 | $30.00 |
Total Fees: | $9,552.46 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|