Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/26/2010 PERMIT SUB-TYPE: SNEW PERMIT NO: B10-1636
JOB ADDRESS:
10094 TATE LN
FRISCO, TX 75034
DESC:   3102 AC, 4396 SF, SFR / 1 STORY
OWNER:
NELSON HOMES LLC
14620 CYPRUS POINT
DALLAS TX 75234

CONTRACTOR:
NELSON HOMES LLC
14620 CYPRUS POINT
DALLAS TX 75234
ISSUED DATE:
7/29/2010
APPLIED DATE:
7/19/2010
EXPIRED DATE:
1/25/2011
SITE APN:
D296506
STATUS:
COMPLETED
APPLICANT:
NELSON HOMES LLC
14620 CYPRUS POINT
DALLAS TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
231440.22
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 09/21/2010 CSW$30.00
CREDIT CARD FEE$4.50
CREDIT CARD FEE$0.90
RESIDENTIAL ELECTRIC FEE$131.88
MISCELLANOUS MECHANICAL FEES$123.00
MISCELLANEOUS PLUMBING FEES$218.00
BUILDING PERMIT FEE$1,653.75
FENCE FEE$20.00
PLUMBTOPOUT/MECHRGH 09/14/2010$30.00
PLUMBTOPOUT/MECHRGH 09/16/2010$30.00
UTILITY / ROW 03/08/2011 KB$30.00
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
FLATWORK 12/02/2010 REED$30.00
GAS RELEASE 01/14/2011 TRC$30.00
GAS RELEASE 01/18/2011 TRC$30.00
PLUMBING FINAL 01/18/2011 TRC$30.00
PLUMBING FINAL 03/08/2011 TRC$30.00
PLUMBING FINAL 03/10/2011 TRC$30.00
Total Fees:$2,882.03
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION
______  DRY WALL
______  FLATWORK
______  T-HEAT
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  T-HEAT
______  GAS RELEASE
______  ELECTRICAL RELEASE
______  PLUMBING FINAL
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBING FINAL
______  UTILITY / ROW
______  PLUMBING FINAL
______  UTILITY / ROW
______  PLUMBING FINAL
______  CO/BUILDING FINAL
______  PLUMBING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)