|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/26/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-1636
|
JOB ADDRESS: 10094 TATE LN FRISCO, TX 75034 |
DESC:
3102 AC, 4396 SF, SFR / 1 STORY |
|
OWNER:
NELSON HOMES LLC
14620 CYPRUS POINT DALLAS TX 75234
|
CONTRACTOR:
NELSON HOMES LLC
14620 CYPRUS POINT DALLAS TX 75234
|
ISSUED DATE: 7/29/2010
APPLIED DATE:7/19/2010
EXPIRED DATE:1/25/2011
SITE APN:D296506
STATUS:COMPLETED
|
|
APPLICANT:
NELSON HOMES LLC
14620 CYPRUS POINT DALLAS TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 231440.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 09/21/2010 CSW | $30.00 |
CREDIT CARD FEE | $4.50 |
CREDIT CARD FEE | $0.90 |
RESIDENTIAL ELECTRIC FEE | $131.88 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $218.00 |
BUILDING PERMIT FEE | $1,653.75 |
FENCE FEE | $20.00 |
PLUMBTOPOUT/MECHRGH 09/14/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 09/16/2010 | $30.00 |
UTILITY / ROW 03/08/2011 KB | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
FLATWORK 12/02/2010 REED | $30.00 |
GAS RELEASE 01/14/2011 TRC | $30.00 |
GAS RELEASE 01/18/2011 TRC | $30.00 |
PLUMBING FINAL 01/18/2011 TRC | $30.00 |
PLUMBING FINAL 03/08/2011 TRC | $30.00 |
PLUMBING FINAL 03/10/2011 TRC | $30.00 |
Total Fees: | $2,882.03 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ T-HEAT |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ T-HEAT |
______ GAS RELEASE |
______ ELECTRICAL RELEASE |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ PLUMBING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|