|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/23/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-1635
|
JOB ADDRESS: 13879 VERANDA FRISCO, TX 75035 |
DESC:
3246 AC, 3772 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 7/30/2010
APPLIED DATE:7/19/2010
EXPIRED DATE:1/26/2011
SITE APN:C2637846
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 242184.06
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SHEATHING 10/05/2010 CSW | $30.00 |
ELECTRICAL ROUGH IN 10/05/2010 | $30.00 |
REPLACE READABLE REGISTER | $190.00 |
2NDS/FRAMING 10/11/2010 GDS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $113.16 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,708.75 |
FENCE FEE | $20.00 |
PLUMBTOPOUT/MECHRGH 10/05/2010 | $30.00 |
PLUMBING FINAL 11/17/2010 JTH | $30.00 |
THOROUGHFARE IMPACT FEE | $1,683.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $28.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
Total Fees: | $5,044.91 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ WATER REGISTER |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|