|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/16/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-1592
|
JOB ADDRESS: 8719 KELVINGTON DR FRISCO, TX |
DESC:
4513 AC, 5401 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST STE 20-0 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST STE 20-0 DALLAS TX 75230
|
ISSUED DATE: 7/29/2010
APPLIED DATE:7/14/2010
EXPIRED DATE:1/25/2011
SITE APN:C2649972
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST STE 20-0 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 336714.93
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 10/05/2010 GLQ | $30.00 |
BRICK/WALL TIES 10/07/2010 GL | $30.00 |
GAS RELEASE 11/18/2010 JBS | $30.00 |
THOROUGHFARE IMPACT FEE | $1,967.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBTOPOUT/MECHRGH 09/27/2010 | $30.00 |
PLUMBING ROUGH-IN 09/24/2010 | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,178.75 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
RESIDENTIAL ELECTRIC FEE | $162.03 |
CAMERA 09/03/2010 CB | $30.00 |
FLATWORK 09/02/2010 JKT | $30.00 |
Total Fees: | $8,848.28 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ CAMERA |
______ CAMERA |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ SHEATHING |
______ BRICK/WALL TIES |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|