Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/28/2010 PERMIT SUB-TYPE: SNEW PERMIT NO: B10-1577
JOB ADDRESS:
4046 GLENHURST LN
FRISCO, TX 75034
DESC:   4818 AC, 6276 SF, SFR / 2 STORY
OWNER:
PLATINUM SERIES BY MARK MOLTHA
8100 LOMO ALTO SUITE 180
DALLAS TX 75225

CONTRACTOR:
PLATINUM SERIES BY MARK MOLTHA
8100 LOMO ALTO SUITE 180
DALLAS TX 75225
ISSUED DATE:
7/29/2010
APPLIED DATE:
7/12/2010
EXPIRED DATE:
1/25/2011
SITE APN:
D296542
STATUS:
COMPLETED
APPLICANT:
PLATINUM SERIES BY MARK MOLTHA
8100 LOMO ALTO SUITE 180
DALLAS TX 75225
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
359470.98
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
1 INCH PD METER$355.00
CREDIT CARD FEE$3.60
PLUMBING FINAL 05/05/2011 JBS$30.00
PLUMBING FINAL 05/09/2011 JBS$30.00
RESIDENTIAL ELECTRIC FEE$188.28
MISCELLANOUS MECHANICAL FEES$162.50
MISCELLANEOUS PLUMBING FEES$274.00
BUILDING PERMIT FEE$2,293.75
FENCE FEE$20.00
2NDS/FRAMING 10/26/2010 JDSM$30.00
ELECTRICAL FINAL 03/10/2011 J$30.00
PLUMBING TOP OUT 10/19/2010 J$30.00
ELECTRICAL ROUGH IN 10/19/2010$30.00
DRY WALL 11/16/2010 REED$30.00
FIRE DEPT INSPECTION FEES$188.28
Total Fees:$3,770.41
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  MISC SLAB
______  SLAB
______  CAMERA
______  AUTOFIRE SPRK HYDRO
______  AUTOFIRE SPRK VISUAL
______  ELECTRICAL ROUGH IN
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  MECHANICAL ROUGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  LATH
______  DRY WALL
______  BRICK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  GAS RELEASE
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  UTILITY / ROW
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)