|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/9/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-1249
|
JOB ADDRESS: 10414 TOFFENHAM FRISCO, TX 75035 |
DESC:
4744 AC, 5304 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
15950 N DALLAS PKY #600 DALLAS TX 75248
|
CONTRACTOR:
GRAND HOMES
15950 N DALLAS PKY #600 DALLAS TX 75248
|
ISSUED DATE: 6/15/2010
APPLIED DATE:6/2/2010
EXPIRED DATE:12/12/2010
SITE APN:C2635788
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
15950 N DALLAS PKY #600 DALLAS TX 75248
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 353949.84
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 06/17/2010 RRK | $50.00 |
CAMERA 07/01/2010 CB | $30.00 |
FLATWORK 08/23/2010 CW | $30.00 |
2NDS/FRAMING 08/05/2010 GLQ | $30.00 |
PLUMBTOPOUT/MECHRGH 08/02/2010 | $30.00 |
PLUMBING FINAL 09/24/2010 JBS | $30.00 |
ELECTRICAL ROUGH IN 08/02/2010 | $30.00 |
INSULATION 08/11/2010 JTH | $30.00 |
UTILITY / ROW 10/12/2010 KB | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBING ROUGH-IN 06/18/2010 | $30.00 |
PLUMBING ROUGH-IN 06/21/2010 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $159.12 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $2,263.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,618.87 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|