|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/27/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-1129
|
JOB ADDRESS: 14070 UNION GROVE LN FRISCO, TX 75034 |
DESC:
3883 AC, 4525 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
500 CRESCENT CT #350 DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS HOMES
500 CRESCENT CT #350 DALLAS TX 75201
|
ISSUED DATE: 6/1/2010
APPLIED DATE:5/20/2010
EXPIRED DATE:11/28/2010
SITE APN:D288080
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
500 CRESCENT CT #350 DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 289710.63
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 07/07/2010 CSW | $30.00 |
2NDS/FRAMING 07/09/2010 CSW | $30.00 |
INSULATION 07/19/2010 CSW | $30.00 |
SLAB 06/10/2010 GDS | $30.00 |
ELECTRICAL ROUGH IN 07/01/2010 | $30.00 |
PLUMBING FINAL 08/23/2010 JTH | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBTOPOUT/MECHRGH 07/01/2010 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $135.75 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $239.00 |
BUILDING PERMIT FEE | $1,943.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,114.50 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|