|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/12/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0967
|
JOB ADDRESS: 3579 MUNSTEAD TRL FRISCO, TX 75034 |
DESC:
4833 AC, 5924 SF, SFR / 2 STORY |
|
OWNER:
JPAS DEVELOPMENT CORPPRATION
10400 BURGUNDY DRIVE FRISCO TX 75035
|
CONTRACTOR:
JPAS DEVELOPMENT CORPPRATION
10400 BURGUNDY DRIVE FRISCO TX 75035
|
ISSUED DATE: 5/13/2010
APPLIED DATE:5/6/2010
EXPIRED DATE:11/9/2010
SITE APN:D253835
STATUS:COMPLETED
|
|
APPLICANT:
JPAS DEVELOPMENT CORPPRATION
10400 BURGUNDY DRIVE FRISCO TX 75035
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 360590.13
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL ROUGH IN 07/19/2010 | $30.00 |
2NDS/FRAMING 07/27/2010 CSW | $30.00 |
BRICK/WALL TIES 08/16/2010 CS | $30.00 |
ELECTRICAL ROUGH IN 07/21/2010 | $30.00 |
CREDIT CARD FEE | $3.60 |
CREDIT CARD FEE | $1.80 |
PLUMBTOPOUT/MECHRGH 07/19/2010 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $177.72 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
BUILDING PERMIT FEE | $2,298.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
PLUMBTOPOUT/MECHRGH 07/21/2010 | $30.00 |
Total Fees: | $3,544.37 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|