|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/8/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0640
|
JOB ADDRESS: 10249 CASABELLA DR FRISCO, TX |
DESC:
4348 AC, 5447 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
500 CRESCENT CT #350 DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS HOMES
500 CRESCENT CT #350 DALLAS TX 75201
|
ISSUED DATE: 4/14/2010
APPLIED DATE:3/30/2010
EXPIRED DATE:10/11/2010
SITE APN:C2650114
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
500 CRESCENT CT #350 DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 324404.28
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 06/01/2010 CW | $30.00 |
FLATWORK 07/12/2010 CW | $30.00 |
ELECTRICAL FINAL 07/23/2010 C | $30.00 |
CO/BUILDING FINAL 08/27/2010 | $30.00 |
CO/BUILDING FINAL 09/01/2010 | $30.00 |
PLUMBING FINAL 07/29/2010 JBS | $30.00 |
PLUMBING FINAL 08/02/2010 JBS | $30.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
RESIDENTIAL ELECTRIC FEE | $163.41 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,118.75 |
FENCE FEE | $20.00 |
Total Fees: | $10,817.16 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|