|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/19/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0496
|
JOB ADDRESS: 10925 SOUTHBURY LN FRISCO, TX 75034 |
DESC:
4794 AC, 5757 SF, SFR / 2 STORY |
|
OWNER:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
CONTRACTOR:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
ISSUED DATE: 4/16/2010
APPLIED DATE:3/15/2010
EXPIRED DATE:10/13/2010
SITE APN:D296382
STATUS:COMPLETED
|
|
APPLICANT:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 350144.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 04/20/2010 BS | $30.00 |
CAMERA 05/04/2010 CB | $30.00 |
CREDIT CARD FEE | $5.74 |
CREDIT CARD FEE | $1.80 |
PLUMBING ROUGH-IN 4/22/2010 12 | $30.00 |
PLUMBTOPOUT/MECHRGH 06/17/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 06/21/2010 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $3.06 |
MISCELLANEOUS BUILDING PERMIT | $48.40 |
PLAN REVIEW FEE | $50.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH PD METER | $355.00 |
RESIDENTIAL ELECTRIC FEE | $169.65 |
MISCELLANOUS MECHANICAL FEES | $169.00 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
BUILDING PERMIT FEE | $2,248.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,587.40 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ LATH |
______ LATH |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ T-POLE |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|