|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/17/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0491
|
JOB ADDRESS: 6609 PARKER CREEK PL FRISCO, TX 75034 |
DESC:
3476 AC, 4235 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
CONTRACTOR:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
ISSUED DATE: 4/7/2010
APPLIED DATE:3/15/2010
EXPIRED DATE:10/4/2010
SITE APN:D297656
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES, LTD
2400 DALLAS PKWY, STE 560 PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 259344.36
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 07/02/2010 CK | $30.00 |
CREDIT CARD FEE | $2.70 |
CREDIT CARD FEE | $2.70 |
2NDS/FRAMING 05/17/2010 JKT | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $355.00 |
2NDS/FRAMING 05/14/2010 REED | $30.00 |
INSULATION 5/20/2010 12:00:00 | $30.00 |
PLUMBTOPOUT/MECHRGH 5/7/2010 1 | $30.00 |
PLUMBTOPOUT/MECHRGH 5/12/2010 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $127.05 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $1,793.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,972.70 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ MISC SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ LATH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|