|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/9/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0375
|
JOB ADDRESS: 13855 VERANDA FRISCO, TX 75035 |
DESC:
2785 AC, 3345 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 3/11/2010
APPLIED DATE:2/25/2010
EXPIRED DATE:9/7/2010
SITE APN:C2637847
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 207788.85
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $1.80 |
INSULATION 4/28/2010 12:00:00 | $30.00 |
CO/BUILDING FINAL 06/28/2010 | $30.00 |
CO/BUILDING FINAL 06/28/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 4/16/2010 | $30.00 |
UTILITY / ROW 06/24/2010 KB | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.30 |
THOROUGHFARE IMPACT FEE | $1,683.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $28.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
CREDIT CARD FEE | $0.90 |
PLUMBTOPOUT/MECHRGH 4/15/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 4/21/2010 | $30.00 |
PLUMBING FINAL 06/15/2010 TRC | $30.00 |
PLUMBING FINAL 06/21/2010 TRC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $100.35 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,533.75 |
FENCE FEE | $20.00 |
Total Fees: | $4,741.60 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|