|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/5/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0367
|
JOB ADDRESS: 11786 GOLDEN BELL LN FRISCO, TX 75035 |
DESC:
3094 AC, 3721 SF, SFR / 1 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 3/18/2010
APPLIED DATE:2/24/2010
EXPIRED DATE:9/14/2010
SITE APN:C2642043
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 230843.34
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 3/26/2010 12 | $30.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $355.00 |
PLUMBING ROUGH-IN 3/24/2010 12 | $30.00 |
PLUMBTOPOUT/MECHRGH 4/27/2010 | $30.00 |
PLUMBING FINAL 06/22/2010 TRC | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,648.75 |
MISCELLANEOUS PLUMBING FEES | $216.00 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
RESIDENTIAL ELECTRIC FEE | $111.63 |
2NDS/FRAMING 5/3/2010 12:00:00 | $30.00 |
ELECTRICAL ROUGH IN 04/27/2010 | $30.00 |
Total Fees: | $10,194.38 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|