|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/3/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0156
|
JOB ADDRESS: 1091 CENTENNIAL MILL LN FRISCO, TX 75034 |
DESC:
1783 AC, 2577 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 2/23/2010
APPLIED DATE:1/27/2010
EXPIRED DATE:8/22/2010
SITE APN:D534479
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 133029.63
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,163.75 |
MISCELLANEOUS PLUMBING FEES | $195.00 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
RESIDENTIAL ELECTRIC FEE | $76.56 |
CREDIT CARD FEE | $0.90 |
THOROUGHFARE IMPACT FEE | $2,469.00 |
SEWER IMPACT FEE | $1,553.00 |
WATER IMPACT FEE | $1,911.00 |
SLAB 3/26/2010 12:00:00 AM CW | $30.00 |
FLATWORK 05/04/2010 CSW | $30.00 |
ELECTRICAL ROUGH IN 4/20/2010 | $30.00 |
Total Fees: | $7,934.21 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ LATH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|