|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/14/2010
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B10-0026
|
JOB ADDRESS: 11011 BRIGHTON LN FRISCO, TX |
DESC:
4345 AC, 5190 SF, SFR / 2 STORY |
|
OWNER:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
CONTRACTOR:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
ISSUED DATE: 1/22/2010
APPLIED DATE:1/12/2010
EXPIRED DATE:7/21/2010
SITE APN:D283483
STATUS:COMPLETED
|
|
APPLICANT:
NEWCASTLE HOMES
8333 DOUGLAS AVE, # 1500 DALLAS TX 75225
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 324180.45
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA FAILED | $30.00 |
CAMERA FAILED | $30.00 |
CREDIT CARD FEE | $4.50 |
CREDIT CARD FEE | $2.70 |
PLUMBING FINAL 06/23/2010 GU | $30.00 |
PLUMBING FINAL 06/10/2010 JBS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $155.70 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,118.75 |
FENCE FEE | $20.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
ELECTRICAL FINAL 5/11/2010 12: | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
PLUMBTOPOUT/MECHRGH 3/17/2010 | $30.00 |
Total Fees: | $3,316.65 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SET 1 PD METER |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ LATH |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|