|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/22/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-2340
|
JOB ADDRESS: 12275 NANDINA LN FRISCO, TX 75035 |
DESC:
4516 AC, 5693 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 1/19/2010
APPLIED DATE:12/21/2009
EXPIRED DATE:7/18/2010
SITE APN:C2642156
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 336938.76
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 5/26/2010 12: | $30.00 |
CO/BUILDING FINAL 06/18/2010 | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
ELECTRICAL ROUGH IN 3/30/2010 | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $170.79 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $288.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,178.75 |
ELECTRICAL ROUGH IN 3/26/2010 | $30.00 |
2NDS/FRAMING 4/2/2010 12:00:00 | $30.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
PLUMBING FINAL 05/27/2010 MC | $30.00 |
PLUMBTOPOUT/MECHRGH 3/16/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 3/18/2010 | $30.00 |
PLUMBTOPOUT/MECHRGH 3/19/2010 | $30.00 |
SLAB 2/5/2010 | $30.00 |
Total Fees: | $10,980.04 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ BRICK |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBING ROUGH-IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|