Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/9/2009 PERMIT SUB-TYPE: SNEW PERMIT NO: B09-2247
JOB ADDRESS:
12320 MILL RUN
FRISCO, TX 75035
DESC:   4590 AC, 5360 SF, SFR / 2 STORY
OWNER:
LANDON HOMES
4050 W PARK BLVD
PLANO TX 75093

CONTRACTOR:
LANDON HOMES
4050 W PARK BLVD
PLANO TX 75093
ISSUED DATE:
12/15/2009
APPLIED DATE:
12/3/2009
EXPIRED DATE:
6/13/2010
SITE APN:
C2631866
STATUS:
COMPLETED
APPLICANT:
LANDON HOMES
4050 W PARK BLVD
PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
342459.9
FEE SUMMARY
INSPECTION SUMMARY
SET 1 PD METER 12/28/2009 12:0$30.00
1 INCH METER$290.00
WATER METER DEPOSIT$75.00
RESIDENTIAL ELECTRIC FEE$160.80
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$260.00
BUILDING PERMIT FEE$2,208.75
FENCE FEE$20.00
ELECTRICAL ROUGH IN 2/26/2010$30.00
RESIDENTIAL RED TAG FEE$30.00
PLUMBING FINAL 5/25/2010 12:00$30.00
CREDIT CARD FEE$0.90
CREDIT CARD FEE$1.80
Total Fees:$3,273.25
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK
______  FLATWORK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)