Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/29/2009 PERMIT SUB-TYPE: SNEW PERMIT NO: B09-1844
JOB ADDRESS:
12521 FLANDERS DR
FRISCO, TX
DESC:   4016 AC, 4785 SF, SFR / 2 STORY
OWNER:
LANDON HOMES
5800 GRANITE PKWY 210
PLANO TX 75024

CONTRACTOR:
LANDON HOMES
5800 GRANITE PKWY 210
PLANO TX 75024
ISSUED DATE:
12/1/2009
APPLIED DATE:
9/28/2009
EXPIRED DATE:
5/30/2010
SITE APN:
D272459
STATUS:
COMPLETED
APPLICANT:
LANDON HOMES
5800 GRANITE PKWY 210
PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
299633.76
FEE SUMMARY
INSPECTION SUMMARY
RESIDENTIAL RED TAG FEE$30.00
1 INCH CURBSTOP REPAIR / REPLA$320.00
CREDIT CARD FEE$1.80
CREDIT CARD FEE$13.20
CREDIT CARD FEE$0.90
2NDS/FRAMING 2/11/2010$30.00
DRY WALL 2/22/2010$30.00
PLUMBING FINAL 4/6/2010 12:00:$30.00
RESIDENTIAL ELECTRIC FEE$143.55
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$1,993.75
FENCE FEE$20.00
PLAN REVIEW FEE$50.00
RESIDENTIAL RED TAG FEE$30.00
CO/BUILDING FINAL 04/29/2010$30.00
UTILITY / ROW 04/23/2010 KB$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
PLUMBING ROUGH- 12/8/2009$30.00
RESIDENTIAL RED TAG FEE$30.00
PLUMBTOPOUT/MEC 2/8/2010$30.00
Total Fees:$3,597.20
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  ELECTRICAL ROUGH IN
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  ELECTRICAL ROUGH IN
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK
______  FLATWORK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)