|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/23/2009
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B09-1792
|
JOB ADDRESS: 13643 LYNDHURST DR FRISCO, TX |
DESC:
3891 AC, 4738 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 9/30/2009
APPLIED DATE:9/22/2009
EXPIRED DATE:3/29/2010
SITE APN:C2649993
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 290307.51
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL RED TAG FEE | $30.00 |
SLAB 11/20/2009 CSW | $30.00 |
FLATWORK 11/20/2009 CSW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL ELECTRIC FEE | $142.14 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,948.75 |
FENCE FEE | $20.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
THOROUGHFARE IMPACT FEE | $1,967.00 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
PLUMBING FINAL 3/22/2010 12:00 | $30.00 |
PLUMBTOPOUT/MEC 12/29/2009 | $30.00 |
Total Fees: | $8,468.89 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PIER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|